modular buildings

Team Module Indonesia is specialized in design and
fabrication of modular buildings which can be used for
hotels, resorts,private bungalows and villas,
dormitories, hospitals, student housing and
camp facilities for Oil, Gas and Mining projects

Seeing is Believing

Team Module has 15 years of experience in modular buildings
and is in a position to support their Clients based on full EPC
from concept to completion

SEAMLESS PROCESS

Team Module will guide you through the process
from concept to completion to ensure, that you
get exactly what you desire when we hand
the building over to you.

previous arrow
next arrow
Slider

TMI MODULAR

FEATURED PROJECT

IMG_0452

Management Accommodation Lampung

Just completed for a Client in Lampung, Management Accommodation and modern Kitchen Canteen consisting of 17 modules. On site construction period of 2 months

Dive-resort-11-2

Modular Hotel Raja Ampat

The first custom designed modular  hotel built in Raja Ampat with 6 months construction on site utilizing 61 modular units.

IMG_3471

Camp for Oil and Gas Project in Sulawesi accommodating 182 persons

Custom designed camp utilizing Rapid Response Modules (RRM), modular units and large buildings for accommodation, kitchen mess hall, sports facilities, recreation, etc. consisting of 109 buildings. This camp was constructed on site within 8 months

SEAMLESS PROCESS

Team Module will guide you through the process from concept to completion to ensure, that you get exactly what you desire when we hand the building over to you

design

1st Stage
Design Process

Design Process

Whether you have created the concept for your project already or if you are still in the idea stage, our architects will guide you to visualize your design wishes. The required detail will be discussed in this phase and the total budget will be agreed from fabrication until installation.

fabrication

2nd Stage
Fabrication Process

Fabrication Process

The Fabrication is done in our covered and controlled factory environment. Simultaneously on site the earthworks and foundations are done. This way, instead of one after the other, a significant amount of time is saved compared to traditional construction.

Transport

3rd Stage
Transportation to Site

Transportation to Site

Once the fabrication is completed and the foundations are done on site, the modules will be properly packed and transported to the project site for installation. Transportation can be done in batches of completion either by road or by sea.

CIMG2183-2

4th Stage
Installation and Finishing

Installation and Finishing

After arrival on site, your new modular building is installed, exterior and interior finishing is completed and the mechanical and electrical installation is installed and final testing and commissioning is done

handover3

5th Stage
Handover to Client

Handover to Client

The last stage is handover of the modular building to you including documentation and guidance on how to operate built in components

.

WHY MODULAR INSTEAD OF TRADITIONAL CONSTRUCTION?

Quality is better

Modular units are fabricated in a covered and controlled factory environment with specialized skilled workers. On site there is less dependence on skilled workers who may not always be available on location.

Construction Period is reduced

Fabrication of modular units is done concurrently with earthworks and foundations on site and finishing time of buildings on site is also drastically reduced thereby reducing the construction period to 50 % or less of a traditional construction period

Less Weather Impact on site

The shorter construction period, and since the modular is produced in our controlled factory, delays because of weather impacts are much less than in traditional construction